Blog Archive: March 2026

In this image we see a test fitting of all the turnouts for the yard plant. The idea is that all 7 tracks in the yard must be accessible from the main (center).

Featured Post

March 7, 2026

Laying Out the C&NW Yard

March 1st marked yet another major turning point for the Cedar River Valley: the day the C&NW Yard finally began taking physical shape. After weeks of leveling modules, installing wiring, and confirming alignment across all twelve sections, the focus shifted from carpentry to trackwork—the moment every modeler looks forward to. With the full yard footprint now accessible and stable, I began laying out all seven yard tracks, starting with the ladder and working outward. Seeing the geometry of the yard emerge on the plywood surface brought the project into a new phase, transforming the space from a collection of modules into the beginnings of a functioning railroad.